Wednesday, 2 January 2013

The Keys behind the Project Succees

Most people think that project succeed is only because of the project manager. However, there are lot elements that can be the keys to make the project meets the objectives. Before I analyze more, my friend told me that based on her experience, the project can succeed if there are good team members, trust, good leadership, honest and good plan. Then, based on my project experiences and my observations, what she said is quite similar.

1. Project Manager
S/he is a key of project. As a leader, a project manager I think has to be expert. Though a project manager has not to have technical skills but in my opinion, it could be better if the project manager understand at least major of tecnical skills. Because as project manager, if you have some knowledge, your team members will respect you more. You will find easier to assign the tasks to your team member, direct, support or facilitate them. At least, before you are appointed to be a project manager, you better study first about the project and what the skills and knowledge required on your project. My brother shared his experience in construction project, he is a team member and is only young engineer, so he has to be directed and supported by his supervisor. However, his supervisor though has lot experiences and quite senior, he does have enough skills, knowledge, experiences in construction project. His background is IT. Thus, because of his lack of knowledge and skill, my best brother often finds some issues related to his jobs, and he has to find the solution by himself because his supervisor cannot help him. Even sometime, my brother has to deal the problem with the client without any help of his supervisor.
So, based on this case, a project manager or supervisor at least has to have good knowledge and skills.

A project manager has to be trusted by her/his team members. That is why, first, s/he has to be good in skills and knowledge. No wonder, PMBOK stated that the best power of Project Manager is "expert". Because if you are an expert, your team members will trust you. To be trusted, you also need to be honest. Because the dishonest person will not be trusted by people. Moreover, a project manager also has to trust the team member. In my opinion, a project manager that believes in Theory X McGregor will face more conflict than a project manager who believes in Theory Y McGregor. Because people need to be trusted that they can perform their work and they are competence enough to finish their task. As PM, if you keep asking and directing the task to your team member though you know that they are still in progressing their work and actually it is still under control, people a.k.a your team member will get bored or annoyed and reluctant and sometimes in the worst case they will leave their job and find another job. Sometimes being a X PM will be useful if you are directing young people that lack of experience, skills and knowledge. Because you have to be firm and supportive to them. However, if your team members have lot experience, skills and knowledge, you cannot do the same. You have to trust your team member, just asking them the progress occasionally not too often. You better create a RAM (responsibility assignment matrix) for them, trust them and monitor them.

Back to the power of being an expert, actualy you do not have to be a 100% expert, if you are appointed to handle a project that you are inexperienced in that particular project for instance, you have to manage the event, and you are never experiencing in handling the event, you can do brainstorming to other project manager that succeed in managing the event, you can ask her/him what are success factors and failure factors. If you are willing to learn and get some feedbacks and you can succeed.

A project manager has to be a taugh person. S/he knows what have to be done and how to do it. As project manager, you have to assign the task to your team members. If you do not know the detailed scope of work and the characteristics/skills of your team work, how can you assign them to the task. I have an experience as team member that my project manager actualy is inexperience in managing that kind of project. She did not know what have to be done to meet the project objectives, and she cannot be firm to her team member. That is why at the beginning until the middle of the project, one of team member was in charge in the project. This team member controlled the project and made a decision instead of the project manager. Whilst the project manager, because of her lack of firm leadership, lack of experience in this kind of project, cannot control the whole project. She only controlled in some parts that in my opinion were not the critical parts. The worst part, every regular meeting, the project manager did not lead the meeting, but the project team led the meeting. The project manager kept busy typing on her laptop, created minutes of meeting, emailed the project stakeholders instead of leading the meeting and discussing the key points or project status. The problems of her that she did not review and discussed the project status together with the meeting attendants. She also did not create first the meeting agenda, so the 4 hours meeting did not perform well. If we discussed only the important things and focused on our agenda instead of being busy working alone with own laptop, the meeting would not take too long and more than 4 hours.

Thus, based on some cases, in order to manage project successfully: a project manager needs to have some knowledge or skills related to the project. A project manager has to be honest and trusted by team members. A project manager has to be a firm leader and be organized.

2. Team Member
All the points of the project manager as mentioned above has to be supported by a solid team member. A good project manager may not succeed in managing project if s/he is not supported by her/his team member. But a not good project manager can succeed in completing the project with the solid team members' support.
As long as you have a solid and competence team member, your project will run smoothly. I acted as a Project Manager last year for two days international workshop. I only had 3 team members who really supported me to host the event. We handled starting from the marketing and communication through speakers, participants and sponsors without using any event organizer. We also managed by ourselves the venue, catering, seminar kit, etc. We only need additional people on the D day to help us to be LOs. The event ran successfully, the participants satisfied, there was no any major problem occurred, the speakers satisfied and both speakers and participants right after the event asked us to host another workshop within 3 months. Without the support of my limited team members, the event would not run successfully.
Another example of the role of team member, in this case I acted as team member. My project manager may be a good project manager in other type of project, but in project that I was involved, she is not too good. Because she is not a firm leader, she did not create RAM for her team member, thus, there was lot overlapping tasks, unorganized monitoring, and the team members have to have own initiative and to solve the problem by themselves. Actually, she was lucky that her team members had high responsible, were very competence in performing their tasks and supported the project, thus, the project succeeded. In external parties opinion, the project succeeded because of the role of project manager, but in internal parties, the project succeeded because the role of the whole team members. I strongly believe, if she did not have any support of her team members, for instance the team member resigns, the project would be chaos. So, the role of team members actually is bigger than project manager's role. As project manager, you have to select high responsible and high motivation team members to help you perform the works. Because without them, you will be nothing!

3. A good planning
To create a good planning means you have to be a competence project manager, also have good team members because initial team members will help you in planning the project. Some people quite underestimate the planning in particular in construction project. Most project manager in this industry only focus on schedule plan, cost plan and quality plan. As long as they have these three plans, they will start their project immediately. Though they do not have communication plan or risk management plan yet. That is why, many problems occur in executing process. It is not only because the construction projects are more complex than other projects, it might because in Indonesia, project management is not well implemented. Practitioners in construction project believe in best practice and learning by doing.

I have interviewed some friends who work in construction project. Some of them told me that major problems occurred because there is no good risk management plan. Though their PMO already planned the project risks including all risks identified, risks rank and risk responses, but there are lot new risks that are not identified in planning process, occur in executing process. The risk management plan is created by risk department, but, those persons who created the plan almost never visited the construction site, never updated the risk into risk register as well. Furthermore, most of the risk response plan cannot implement in field work, that was why the project manager and team member had to respond the risk by themselves and did not follow the respond plan as stated in PM plan. In Indonesia, many construction firms hire the project manager outside the organization. Thus, planning is created by engineering department with or without project manager involvement. For instance, project risk management plan is created by Risk Department, people in this department identify the risk, qualify the risks and plan the risk responses without any help from people who will be involved in the project at executing process. In the result, many variances happen in construction site, many new risks happen and many risk responses cannot implement, these all problems, my friends said to me, will increase cost and project delay. They often face penalties from owner because of a not good plan.

Other friend and also based on my experience, another problem related to planning is communication plan. Before starting the project, you better create first your communication line and communication method. How many meetings, how the team members member coordinate and communicate their tasks among stakeholders, etc. Without clear communication plan, conflicts and project reworks will occur often, because that will be lot miscommunication and misunderstanding among stakeholders. My brother also experienced it, as a quality control, he found out that lots misunderstanding and miscommunication among surveyors, laboratory, clients and engineers. He often had to rework the tasks and to rewrite project report due to these problems. Rework will lead to morale decrease, and unmotivated employee will not have good performance, in the end, if this case is not solved immediately will delay the project and increase the project cost.

In summarize, the three elements to make your project succeed are:
1. A firm, trust, honest and competence project manager that can be called Integrity and Competency.
2. A solid and high responsible team member
3. A good planning

Of course, there still are many keys behind the successful of the project. I write these three elements based on my own and my friends experiences. If you have any experiences related to project success, you can inform me so I can update my blog. Thank you for spending your time to read my blog and good luck with your project......

Monday, 19 November 2012

How to pass PMI-RMP on first attempt

A Brief about PMI-Risk Management Professional

PMI-RMP is the Risk Management Professional certification provided by Project Management Institute. The PMI provides several professional certification, such as: CAPM, PMP, PMI-SP, PMI-RMP, PgMP, etc.

PMI-RMP certification is for the risk professionals who work in risk analysis for several industries. This exam was conceived in 2008. Once achieved, this certification places you above the rest in terms of risk management competency.

The certification exam is quite similar to PMP exam, you must be eligible first before taking the exam. The requirement to be eligible can be seen in the pmi website www.pmi.org. You have also to follow audit process if you are selected, but if you are lucky enough to not selected in audit process, after you receive an email that you are eligible, you can schedule your exam at the prometrics website.

The PMI-RMP exam will take 3.5 hours with 170 questions. 150 questions are scored, while 20 are "Pre Release" and not scored. However, you will not be able to identify the pre-release questions. Therefore, you have to answer all questions to the best of your ability.

There are four key areas in the PMI-RMP Body of Knowledge which are:
1. Risk Communication
    Including 27% of all certification exam questions, that contains all six project risk 
    management activities (PIER-C, Plan Risk, Identify Risk, Evaluate Risk, Respond Risk - 
    Control Risk)
2. Risk Analysis
    Including 30% of all certification exam questions and concentrates on five of the six
    project risk management area, except Plan Risk Responses.
3. Risk Response Planning
    Including 26% of all certification exam questions.
4. Risk Governance
    Including 17% of all certification exam questions, covers concepts in the Monitor and
    Control Risks activity.

Tips and Tricks
For me, answering the questions for PMI-RMP certification is quite different with PMP exam. You have to be familiar with risk management terms and your work is pretty often related to risk analysis. Because it is not easy to find a good book of PMI-RMP exam. Meanwhile, for me the exam preparation book is really helpful to pass the exam. It is the exam for certification, sometimes what you are experienced in real world is not the same perspective with the PMI's perspective. You have to familiar with the type of questions, the way of PMI's thinking. Though I passed my PMP and PMI-RMP exam on my first try, I found out that PMI-RMP is quite unique. Because for PMP exam, what you learned and practiced on your PMP exam preparation books or programs, is almost 90% similar. I do not say that the questions are similar, but the type of questions is pretty similar. When answering the PMP questions, you just feel that what you studied is paid off. Because you will find some of questions will ask you the same questions (just different sentences or different list of choices), and it will be easier to answer the questions because you already studied and practiced it before. 

But for the PMI-RMP exam, I just found out that what I learned on my PMI-RMP exam preparation and my simulation is only similar about 50% questions. However, if you are familiar with all the risk terms, the risk analysis tools, it will easier to answer the questions correctly.  Fortunately, that I was involved with risk analysis since 2002, so I am quite familiar with the tools and techniques of all risk activities. Because the questions will ask you more about the tools and techniques of risk management process. Since the PMI-RMP  certification has been established for 4 years since 2008, so the additional books to help you study and practice in answering the questions is quite difficult to find. Moreover, the exam preparation book usually only provide less than 150 practice questions. I used three books to help me pass the exam, but no book that contains 170 practice questions just like real exams. Meanwhile, for PMP exam, there are lot books and simulation software that contain hundred even thousand questions that will help you to practice answering the questions. 

Besides you have to be familiar with all risk management terms, process and tools and techniques that means you have to work in risk department at least three years, for me it is easier to pass the exam if you already pass the PMP exam or study about the whole process of project management. Risk management is part of project management and relates to project scope management, project time management, project quality management, project communication management, project human resource management, project procurement management. Thus, if you know the concept and process of project management that would be easier to understand the risk management process. The questions sometime will ask you the motivation theory as well as the leadership style of project manager for instance. If you have studied about it in preparing your PMP exam, you just need to recall your memories about the concepts and the theories and you also already knew about the interelation among project management knowledge areas and PM process, 42 sub processes as well. Though you do not have to pass the PMP exam first before you take the PMI-RMP exam, you will not more effort to study the interrelation between risk management and other PM knowledge areas.  

So, if you want to pass the exam on your first try, I will give you some tips based on my own experience:
1. Use PMI-RMP exam preparation books, at least use two books. I used three books that are: Passing the Risk Management Professional (PMI-RMP) Certification Exam The First Try by Daniel C. Yeomans, PMI-RMP, PMP, CMQ/OE; Study Guide for the Exam. Risk Management Professional Exam, by Abdulla J. Alkuwaiti, RMP, PMP; Risk Management, tricks of the trade for Project Managers and PMI-RMP Exam Prep Guide, by Rita Mulcahy.
The first book will help you to understand more about risk management based on PMBOK. The explanation on this book is quite simple, very helpful to memorize the risk management processes and also contains 125 simulation questions. 
The second book will help you to understand the risk management by studying the example given on book. Because my background is civil engineering, I found out the book is easy to understand because it gives you a lot example that based on construction project, hehehe. But this book only contains 65 simulation questions. 
The last book in my opinion that does help you much to pass the exam. But if you want to understand more about the risk management, you can read this book cover to cover, because it contains lot of risks that will be happened in the project. 
2. Read your PMI-RMP exam prep books cover to cover. Because those two bookes I described above are not too thick, I read them twice cover to cover just to help me memorize and understand more the concept. Practice to answer the questions on book, over and over until your score reaches more than 90%. I got 100% on my second simulation in practicing answer the questions. 
3. Concern and study more about the risk management process and plan risk response. Do not spend your time in quantitative analysis. In real work, yes you have to know how to perform the risk quantitative analysis but regarding the exam, you do not have to know the detailed of the tools of risk quantitative analysis. Because it only no more than 5 questions relating to quantitative risk analysis.
3. Learn more about the risk terms, the tools and techniqus of risk management processes.
4. Study about what are differences among risk responses for both negative risks and positive risks.
5. Another tips and tricks, I think it is pretty similar to PMP exam. You can read on my previous post about how to pass the PMP exam on your first try.

Just study about the risk management concept, practice in answering the questions and be calm and confident on the D day and believe that you will pass the exam. Good luck for your exam, if you have any questions please do not hesitate to contact me.

Monday, 2 July 2012

How to check PMP Credential Online?

Currently, many projects require that a project manager has to hold PMP certification which is one of the best international certification in Project Management that is provided by The Project Management Institute (PMI). However, in my country some parties in order to win the bid often use 'fake' PMP certification. 'Fake' PMP certification DOES NOT mean other certifications that provided other institutions besides PMI, it means that this certification should be legally provided by PMI, but some parties create their own PMP certificate based on the real one. They easily change the name to put on the certificate meanwhile the person that they put on the certification never take or didn't pass the exam. 

In order to prevent some parties continuously faking the certification, I would to give some information how to check the person who legally hold the certification. You can easily check on pmi website www.pmi.org or click the link certification.pmi.org/registry.aspx .

On the link I mentioned before, you can fill last name of the person that you want to check. You may also filter your search using first name, credential and country. If the person with the correct last name off course is a PMP or other PMI certifications holder, the name is automatically showed on the screen, if s/he does not hold the certification provided by PMI, her/his name will not show. You can an example below

   Hope this help

Thursday, 26 April 2012

Project Management Plan

What is Project Management Plan???

In terms of project management in planning process, a Project Management plan is the most important document that needed to perform work. The project management plan is the sole outputs of develop project management plan in integration management. 

Project Management Plan is a formal and approved document that defines how the project is executed, monitored and controlled. It may be in a form of an executive summary or a detailed document, and it may compose one or more subsidiary management plans and other planning documents
Project plan is used to:
  • Guide project execution
  • Document project planning assumption
  • Document project planning decision based on the selected alternatives
  • Facilitate communication among stakeholders
  • Define key management review 
  • Provide a baseline for progress measurement and project control
The keys to understanding the project management plan:
  1. The project management plan is formal. It is important to think of the project management plan as a formal, written piece of communication.
  2. The project management plan is a single document. It is not 15 separate plans. One those separate documents are approved as the project plan, they become a single document.
  3. The project management plan is approved. In other words, there is a point in time at which it officially becomes the project plan. Who approves it is going to differ based on the organizational structure and other factors, but typically it would be the project manager, the project sponsor, the functional managers who are providing resources for the project.  
  4. The project management plan defines how the project is managed, executed, and controlled. This means that the document provides the guidance on how the bulk of the project will be conducted.
  5. The project management plan may be summary or detailed. 
Components of Project Management Plan:
  • Change Management Plan
  • Configure Management Plan
  • Scope Management Plan
  • Time Management Plan
  • Cost Management Plan
  • Quality Management Plan
  • Process Improved Plan
  • Human Resources Plan
  • Communication Management Plan
  • Risk Management Plan
  • Procurement Management Plan
  • Requirements Management Plan
  • Scope Baseline
  • Cost Performance Baseline
  • Schedule Baseline

 

Project Scope Management



Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

Remember, Scope Management means:
- Constantly checking to make sure all the work are completed
- No additional work include in the Project Charter
- Preventing extra work or gold platting

Process in Project Scope Management:
1. Collect Requirements, the process of defining and documenting stakeholder’s needs to 
     meet the project objectives
 
     Key Inputs: Stakeholder Register
     Key Tools & Techniques:  Facilitated Workshops, Group Creativity Techniques
     Key Outputs: Requirement Documentation, Requirement Traceability Matrix
 
2.  Define Scope: the process of developing a detailed description of project and product
     
     Key Inputs:Project Charter, Requirement Documentations
     Key Tools & Techniques:  Alternatives Identification
     Key Outputs: Project Scope Statement

3.  Create WBS: the process of subdividing project deliverable and project work into smaller 
     and more manageable components

     Key Inputs:Project Scope Statement
     Key Tools & Techniques:  Decomposition
     Key Outputs: WBS, WBS Dictionary, Scope Baseline

4.  Verify Scope: the process of formalizing acceptance of the completed project deliverable

     Key Inputs:Project Management Plan
     Key Tools & Techniques:  Inspection
     Key Outputs: Accepted Deliverable, Change Request

5.  Control Scope: the process of monitoring project status, product scope, and managing 
     changes 

     Key Inputs:Project Management Plan, Work Performance Information
     Key Tools & Techniques:  Variance Analysis
     Key Outputs: Work Performance Measurements

Differences between Verify Scope and Perform Quality Control
Verify Scope:
- Is often performed after Perform Quality Control
- Is primarily concerned with completeness
- Is concerned with the acceptance of the product by the project manager, the sponsor, the 
  customer and others

Perform Quality Control:
- It is not unusual for these processes to be performed at the same time
- Is primarily concerned with correctness
- Is concerned with adherence to the quality specification
 
Important Note: 
If the project is canceled before completion, Verify Scope should be performed to document
where the product was in relation to the scope at the point when the project ended 
 
 


Wednesday, 14 September 2011

Differences Between PMBOK Third and Fourth Edition

The update of the third edition of PMBOK is:

  • Revise the standard so that it would not conflict with any other PMI standards.
  • Ensure the information contained in the standard was cohesive in concept and clear in writing style, and that terminology was well defined and congruous with other publication’s terminology.
  • Research the way life cycles are currently being used in projects and revise or expand them as necessary.
  • Examine the five Project Management Process Group and the 44 project management description processes to determine whether combining, deleting, or adding new processes would add clarity to the standard.
  • Ensure that Knowledge Area updates are congruent with the work done in defining the processes, inputs, and outputs defined by the standards group.

The major differences between PMBOK third edition and fourth edition are summarized below.

  • All process names are in a verb-noun format.
  • A standard approach to discussing enterprise environmental factors and organizational process assets was employed.
  • A standard approach for discussing requested changes, preventive actions, corrective actions, and defect repairs was employed.
  • The processes decreased from 44 to 42. Two processes were deleted, two processes were added, and 6 processes were reconfigured into 4 processes in the Project Procurement Management Knowledge Area.
  • To provide clarity, a distinction was made between the project management plan and project documents used to manage the project.
  • The distinction between the information in the Project Charter and the Project Scope Statement was clarified.
  • The process flow diagrams at the beginning of Chapters 4 through 12 have been deleted.
  • A data flow diagram for each process has been created to show the related processes for the inputs and outputs.
  • A new appendix was added that addresses key interpersonal skills that a project manager utilizes when managing a project.

Tuesday, 13 September 2011

Project Integration Management

Project Integration Management is the processes required to ensure that the various project elements are coordinated effectively. Integration management is the practice of making certain that every part of the project is coordinated.


Process Group
Integration Management Process
Initiating
Develop Project Charter
Planning
Develop Project Management Plan
Executing
Direct and Manage Project Execution
Monitoring & Controlling
Monitor & Control Project Work
Perform Integrated Change Control
Closing
Close Project or Phase


Process
Key Outputs
Develop Project Charter
Project Charter
Develop Project Management PlanProject Management Plan
Direct and Manage Project ExecutionDeliverables
Work Performance Information
Change Request
Monitor & Control Project WorkChange Request
Perform Integrated Change ControlChange Request Status Updates
Close Project or PhaseFinal Product, Service, or Result Transition


DEVELOP PROJECT CHARTER


Project Charter is used to authorize a project to begin and to provide the project manager with the authority necessary to execute the project. The Project Manager should be identified and assigned as early in the project as is feasible, but always prior to project planning and preferably during project charter development. The project charter should be issued by project sponsor or other persons at a level sufficient in the organization to commit funding.

Input:
  • Project Statement of Work (a written description of the project's product, service, or result)
  • Business Case
  • Contract
  • Enterprise Environmental Factors
  • Organizational Process Assets
Project Charter outline: business need, product description, constraint, assumption, statement of authority and accountability, project manager authority, project manager responsibilities.


DEVELOP PROJECT MANAGEMENT PLAN

Project plan is used to:

  • Guide project execution
  • Document project planning assumption
  • Document project planning decision based on the selected alternatives
  • Facilitate communication among stakeholders
  • Define key management review
  • Provide a baseline for progress measurement and project control


Inputs to the develop project management plan process:

  1. Preliminary project scope statement
  2. Project management process
  3. Enterprise environmental factors
  4. Organizational process assets

Tools and techniques used to develop the project management plan:

  1. Project management methodology
  2. Project management information system
  3. Expert Judgement

DIRECT AND MANAGE PROJECT EXECUTION

The purpose of the
direct and manage project execution is to execute the work defined in the project management plan in order to achieve the project requirements detailed in the project scope statement. In this phase, the majority of the project’s budget is spent.

Tools and techniques for the direct and manage project execution process

  1. Project management methodology
  2. Project management information system

Outputs from the direct and manage project execution process

  1. Deliverables
  2. Requested changes
  3. Implemented change request
  4. Implemented corrective actions
  5. Implemented preventive actions
  6. Implemented defect repair
  7. Work performance information

MONITOR AND CONTROL PROJECT WORK
The process of tracking, reviewing, and regulating the progress to meet the performance objectives defined in the Project Management Plan

Input
  • Project Management Plan
  • Performance Reports
  • Enterprise Environmental Factors
  • Organizational Process Assets
Tools & Techniques
  • Expert Judgement
Output
  • Change Request
  • Project Management Plan Updates
  • Project Document Updates

PERFORM INTEGRATED CHANGE CONTROL

means coordinating changes across the project. The process includes reviewing requests, approving changes and controlling changes to the deliverable (any unique and verifiable product, result or capability to perform a service that is identified in the project management planning documentation and must be produced and provided to complete the project).

Output
  • Change Request Status Update
Tools & Techniques
  • Expert Judgement
Concerned with:
  • Influencing the factors that create changes to ensure that changes are agreed upon
  • Determining that change has occurred
  • Managing the actual change when they occurs

CLOSE PROJECT OR PHASE

The process of finalizing all activities across Project Management Process Groups to formally complete the project or phase.
Close
Project or Phase is all about shutting the project down properly. This includes creating the necessary documentation and archives, capturing the lesson learned, ensuring that contract is properly closed, and updating all organizational process assets.

Output

  • Final product, service, result transition

Tools & Techniques